The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Mid-Florida Area Site #501

Site 501

System type: ICS system
Installed: 1997
Inspected: 2003

No operational problems with system.

Insulation is deteriorating and gaps are evident between insulation sections. Long pipe run at this site. Lot of leaf accumulation against long pipe runs. Pressure relief valve lever is very rusted.