The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Citrus Area Site #3

Site 3

System type: ICS system
Installed: Sep 96
Inspected: Nov 02

System is working. No problems.

No problem with system. Client satisfied.