The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Mid-Florida Area Site #401

Site 401

System type: ICS
Installed: 1996
Inspected: 2003

System working fine. New owner did not know what system did. Inspector provided information and checked system. Tape used to hold insulation is deteriorating but insulation is in satisfactory condition. Hard to access system valves above elevated tank.