The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Metro-Dade Area Site #312

Site 319

System type: Pumped - photovoltaic control
Installed: 1997
Inspected: 2003

System is working. Anti scald valve stuck at 3. Still functioning.