The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Metro-Dade Area Site #288
Site 288

System type: Pumped - photovoltaic control
Installed: 1996
Inspected: 2003

System is working.

Air vent had developed a leak at the port and client screwed cap on tight to keep it from leaking. Left new air vent with client and instructions on how to replace.

Freeze valve has mud dauber plugs.

Roof sealing material in pitch pans is drying and starting to crack and create gaps for rain penetration.