The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Metro-Dade Area Site #195
Site 195

System type: Pumped – differential controlled
Installed: 1997
Inspected: 2003

System is operational.
Controller tester indicates all modes are working. Sensor readings are reasonable.
Anti-scald valve stuck but operating.
Leak at collector pressure relief valve. Freeze valve metal parts rusting.
Gaps in insulation exposing copper piping.
Standard pitch pans do not appear to have been used at roof.
Insulation facing in collector is coming off.