The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Metro-Dade Area Site #154

Site 154
System type: Pumped - timer control
Installed: 1997
Inspected: 2003

No one home.

Air vent exhibits sediment buildup. Freeze valve and freeze valve plumbing leg placed under backside shade of collector. Left card and note to contact.