The Florida Solar Energy Center Logo
 
 
 
Home > Research > Solar Thermal > SWAP > Ten Years After > Metro-Dade Area Site #145
Site 145

System type: Pumped - timer control
Installed: 1996
Inspected: 2003

No one home.

Air vent leaking. Pressure and freeze valves look fine. Left card and note to contact.